The renovation works that took place at the Barchetta Excelsior Hotel consisted in the reconstruction of the façades, the replacement of doors and windows with thermal-break and high energy-efficient ones, the roof and the installation of new equipment for the heating and air-conditioning system. The existing façades have been replaced partly with ventilated ones. All these works have been done extremely quickly, during the hotel’s winter closing.