Eldor

Monday, 03 July 2017

The industrial and R&D complex of Eldor Corporation S.p.A. is made up of several buildings for approximately 16,000 square meters.
 The office building should be highlighted, lined with Navona travertine, which can be found in the quarries of Tivoli (the same as the colonnade of San Pietro in Rome).
 The installations - which go to serve all the offices - were built completely underground on an area of approximately 4,500/5,000 square meters. The White Tank System solution with Zementol system was chosen for the waterproofing of this area, which is intended to work the concrete keeping the water/cement ratio under control and the installation of a series of joints to monitor the Micro cracking of the concrete.

Bennet Montano Lucino

Monday, 03 July 2017

The renovation and expansion of the Bennet of Montano Lucino were carried out in four stages:
 1. Expansion of the management and administrative headquarters through the construction of a new volume made up of an underground floor with conference room and meeting rooms (2007 – 2008);
 2. Restructuring of the existing administrative offices (2008 – 2009);
 3. Restyling of the façades and refurbishment of the entrances (2008 – 2009)
 4. Expansion of the hypermarket - sales hall and dining area located on the 1st floor - with the addition of a new panoramic lift, which, together with the escalator, has improved the link between the two floors (2008 – 2010).
The work was characterized by logistical problems linked to the need not to disrupt the activities of the offices and the shopping centre during the execution of the work.

Lion

Monday, 03 July 2017

Within a larger artisanal building built in the Municipality of Montano Lucino, as part of an industrial-commercial appointment plan, an area of 1,200 square meters on two levels was completed on behalf of the Company Lion Italia S.r.l.
In the building, made with a totally prefabricated solution (pillars, beams, slabs, roofing tiles and façade panels), an artisan activity is carried out by the company and at the same time, there are spaces dedicated to warehouses, offices and showrooms.
A particular of the building was the implementation of the water supply tank of the sprinkler system of the automatic fire extinguishing system, with the capacity of approximately 250 cubic meters, with a reinforced concrete structure, positioned completely underground close to the road. The outdoor parking spaces and green area complete the establishment.

Bianchi Group

Monday, 03 July 2017

An industrial property was constructed in the Municipality of Montano Lucino for the logistics commissioned by the Bianchi Group, where logistics and trucking operations are carried out.
The property has a covered area of 6,550 square meters and develops on a raised ground floor equipped with loading bays - where the spaces for carrying out logistics and trucking activities are located, as well as a part of the offices - and on a first and second floor (each of 500 square meters) where the offices are located. A main staircase and a lift connect the three levels.
The property has a total area of approximately 9,000 square meters intended for private parking, parking space for public use and loading and unloading areas.
The building was made with a prefabricated structure - for the vertical structures, the floors on the first floor and the roofing - and foundations consisting of pillars and foundation beams in reinforced concrete resting on foundation piles.
The main finishing features are the industrial floor of the production area in concrete with quartz dusting of an adequate thickness; the floor of the office area in single-fired ceramic tiles; the ceilings of the office area in soundproof mineral fibre panels, the internal doors in laminated plastic and the external perimeter fixtures in extruded profiles of pre-painted aluminium with thermal insulation glazing.

Lario Express

Monday, 03 July 2017

Construction of a building for industrial use.

Como Docks

Monday, 03 July 2017

Construction work on a new complex in the Municipality of Montano Lucino (CO), Via G. Carducci, intended for office and warehouse use.

Peante L.A.C.

Monday, 03 July 2017

Primary urbanization work consisting in the realization of the new road structure and its connection with the State Road 342 situated in "La Gelata" in Montano Lucino (CO).

Dana

Monday, 03 July 2017

Construction of a building for industrial use.

Catalano

Monday, 03 July 2017

Construction of a building for industrial use.

Axco

Monday, 03 July 2017

Construction work of no. 2 properties for manufacturing in the Municipality of Cadorago (Località Bulgorello) Strada Provinciale della Pioda.

Logo

Nessi & Majocchi SpA
Via Regina Teodolinda, 49/A - 22100 Como
Ph. +39 031 278375
info@nessimajocchi.it

VAT IT00211190137 | Soc. Cap. € 4.000.000,00 i.v. | Business Registration no. Como 00211190137 | REA CO2804 | SDI Code M5UXCR1 | nessimajocchispa@legalmail.it | Privacy | Cookie | Ph. Albo | Credits